24/7 Emergency Well Control & Relief Well Response
CALL +1 281 690 0322 →
Relief-Well Intercept, Kill & P&A, North Dakota, USA
Home  /  Case Studies  /  Relief-Well Intercept, Kill & P&A
Intercept · Kill · P&A · Regulator-witnessed

Relief-Well Intercept, Kill & P&A

North Dakota, USA  ·  2025

World-first commercial wired-pipe AMR-While-Drilling, intercept, kill and P&A

The challenge
  • During conventional P&A, tubing parted at ~1,000 ft; milling to dress the top failed.
  • Only a ~10 ft window below the stuck packer for a precise intercept.
  • Target builds ~18°/100 ft DLS immediately below the packer.
  • High-resistivity salt formation and oil-based mud, with poor target surveys at ~500-ft intervals.
Our solution

DeadAhead™ wired-pipe AMR-While-Drilling, the world's first commercial deployment. Continuous live ranging from the BHA through a six-phase intercept, holding 5–10 ft separation to land on the exact planned depth.

~2 weeks saved vs. wireline AMR · ~$2M direct savings · 10+ runs avoided
The result
~8,640 ft
MD, intercepted at exact planned depth
  • ·Located target at ~3,500 ft
  • ·Held 5–10 ft separation over ~5,500 ft of continuous ranging
  • ·Well killed via bullhead
  • ·Milled, re-entered and cemented under regulator witness
Ranging
AMR-WD
Deployment
Wired drill pipe
Re-entry
Yes
Location
North Dakota, USA
Year
2025
Watch, related footage
Full video library →
3:33

Killing a Ghost Well: Blowout Under a Field Stopped by Relief Well Drilling

2:33

One Contractor for Relief Wells: Range, Intersect, Mill, Kill & Cement

1:21

Casing Milling Up Close: Cutting Into Steel Downhole

Let's talk

Have a well that has to be hit?

24/7 Emergency: +1 281 690 0322 Request a feasibility review →