24/7 Emergency Well Control & Relief Well Response
CALL +1 281 690 0322 →
Nahcolite Solution-Mining Intercept, Colorado, USA
Home  /  Case Studies  /  Nahcolite Solution-Mining Intercept
Solution Mining · Hydraulic Comms · Engineered Intercept

Nahcolite Solution-Mining Intercept

Colorado, USA  ·  2025

Two-well solution-mining intercept, remediating a failed third-party attempt

The challenge
  • Two-well solution-mining system in a nahcolite formation (~1,900–2,100 ft TVD).
  • Required direct intersection / <10 ft proximity for hydraulic communication.
  • A prior third-party attempt missed, the wells passed at ~13 ft with no communication.
Our solution

Re-entered the original target as the drilling well toward the cased original well. Conventional BHA with a 4.75" rotating magnet; receiver behind 7" casing with shielding accounted for. A composite-survey workflow continuously updated relative position to steer the intercept.

Hydraulic communication established where the prior attempt failed
The result
~2,880 ft
MD, wells intersected; comms established
  • ·Reprocessing showed the prior wells had passed at ~13 ft (4.1 m)
  • ·Engineered sidetrack steered with continuous composite-survey updates
  • ·Wells intersected at ~2,880 ft MD / ~2,000 ft TVD
  • ·Hydraulic communication established within the target interval
Ranging
AMR + PMR
Deployment
BHA While Drilling
Re-entry
Yes
Location
Colorado, USA
Year
2025
Watch, related footage
Full video library →
4:29

Reviving a Dry Water Well with Magnetic Ranging | Oklahoma Case Study

2:03

Solution Mining Well Remediation with Wellbore Intersection | Case Study

0:53

Solution Mining Wellbore Services: Ranging, Intersection & Remediation

Let's talk

Have a well that has to be hit?

24/7 Emergency: +1 281 690 0322 Request a feasibility review →