24/7 Emergency Well Control & Relief Well Response
CALL +1 281 690 0322 →
Horizontal Water-Well Intercept Pilot, Oklahoma, USA
Home  /  Case Studies  /  Horizontal Water-Well Intercept Pilot
Water Production · Horizontal Water Well · Intercept

Horizontal Water-Well Intercept Pilot

Oklahoma, USA  ·  2023

A pilot horizontal water well intercepting a vertical production well to multiply aquifer exposure

The challenge
  • Vertical water wells expose only tens of feet of aquifer; demand needs far more.
  • Urban growth limits suitable surface locations for new vertical wells.
  • Connect a horizontal drain to a cased vertical production well to open thousands of feet of aquifer.
Our solution

From an offset well ~300 ft away, coiled-tubing directional drilling builds ~21°/100 ft to a near-horizontal landing, with Gunnar magnetic ranging steering a precise intercept of the 16" cased production well, turning a vertical well into a long horizontal drain.

Horizontal drain, potential for ~100× the aquifer exposure of a vertical well
The result
~100×
aquifer exposure, horizontal drain vs. a vertical water well
  • ·Engineered the offset-to-vertical-well intercept (well plan, ranging, steering)
  • ·Coiled-tubing directional drilling at ~21°/100 ft to a near-horizontal landing
  • ·Magnetic ranging steered the as-drilled path onto the production well
  • ·Proved the concept that scaled into a later six-well program
Ranging
AMR + PMR
Deployment
BHA While Drilling
Re-entry
Yes
Location
Oklahoma, USA
Year
2023
Watch, related footage
Full video library →
4:29

Reviving a Dry Water Well with Magnetic Ranging | Oklahoma Case Study

Let's talk

Have a well that has to be hit?

24/7 Emergency: +1 281 690 0322 Request a feasibility review →