Solution-Mining Well Twinning, Utah, USA
Home  /  Case Studies  /  Solution-Mining Well Twinning
Well Twinning · Solution Mining · Passive Ranging

Solution-Mining Well Twinning

Utah, USA  ·  2023

Passive ranging-while-drilling to twin solution-mining wells for hydraulic communication

The challenge
  • Twin new wells to existing solution-mining cavern wells to open hydraulic communication.
  • Pass within feet of the target at ~8,000+ ft MD through strong, variable salt-induced anomalies.
  • MWD magnetometers saturated near the target, the strongest-signal zone was unusable.
Our solution

Passive magnetic ranging while-drilling on the directional BHA, using MWD XYZ data. Gunnar directed targeted PMR shot collection, split the interference onto axial / cross-axial components to fix the pass-by point, distance and direction, then advised the sidetrack strategy in real time.

Targets located to ±1 ft, hydraulic communication achieved
The result
±1 ft
to target, across multiple wells & sidetracks at ~8,600 ft MD
  • ·Located target wellbores to ±1 ft across the program
  • ·Pass-by separations resolved from 3–15 ft at 8,060–8,680 ft MD
  • ·Guided successive sidetracks to converge on the target for communication
  • ·Same-day turnaround, preliminary report within hours, final overnight
Ranging
PMR
Deployment
BHA While Drilling
Re-entry
No
Location
Utah, USA
Year
2023
Watch, related footage
Full video library →
4:29

Reviving a Dry Water Well with Magnetic Ranging | Oklahoma Case Study

2:03

Solution Mining Well Remediation with Wellbore Intersection | Case Study

0:53

Solution Mining Wellbore Services: Ranging, Intersection & Remediation