4:14 The challenge
- →Through-tubing (concentric) P&A could not set a reliable barrier.
- →A permanent barrier was required below the production packer, deep in the reservoir.
- →Drill an intercept well, locate the target, mill a window and re-enter at high angle.
Our solution
Designed and drilled the intercept well: GWD with passive magnetic ranging while drilling, then active wireline AMR (with AMR-while-drilling) to home in. Located the target, drilled down 30+ m of the target casing, milled a window and re-entered to set a permanent barrier, delivered via Gunnar's Australian entity.
Completed in ~half the forecast time, single intercept above the packer
The result
~50%
time saved vs. forecast
- ·Single intercept above the packer; 30+ m of casing milled and perforated
- ·Gen-2 tools + GWD withstood drilling down casing, no failures reported
- ·Passive-while-drilling + wireline AMR + AMR-while-drilling reduced trips and HSE risk
- ·Overcame the barrier limitation of the earlier concentric P&A attempt
Ranging
AMR + PMR
Deployment
BHA While Drilling
Re-entry
Yes
Location
Western Australia
Year
2025