Offshore Re-Abandonment & P&A Feasibility, Australia
Home  /  Case Studies  /  Offshore Re-Abandonment & P&A Feasibility
Offshore P&A · Intercept Study · CCS Re-Abandonment

Offshore Re-Abandonment & P&A Feasibility

Australia  ·  2025 – ongoing

Re-abandonment and P&A feasibility for two legacy offshore wells, intercept and whipstock-access options

The challenge
  • Re-abandon two legacy offshore wells to modern standards.
  • One well: isolate permeable zones and restore cap-rock integrity to enable CCS repurposing.
  • The other: regain access to a whipstocked main wellbore for permanent P&A.
  • Define the lowest-risk route, direct re-entry vs. a relief / intercept well.
Our solution

Evaluated both wells end-to-end. For the first: an intercept well to locate the wellhead, intersect, cut a window, verify with a target-well CBL, set internal cement barriers and remediate the annulus through the window. For the second: a fishing-whipstock concentric-access route compared against a deep-sidetrack intercept well.

Re-abandonment of both wells assessed feasible, execution planned 2026
The result
Feasible
2 wells, re-abandonment / P&A
  • ·Re-abandonment assessed technically feasible, high probability of success
  • ·100% track record cited: intersect, window-cut, target CBL, internal barriers
  • ·Restores cap-rock integrity to support CCS repurposing
  • ·Two access routes scoped, whipstock concentric access vs. intercept well
Ranging
AMR + PMR
Deployment
BHA While Drilling
Re-entry
Yes
Location
Australia
Year
2025 – ongoing
Watch, related footage
Full video library →
4:14

Intersecting Two Abandoned Wells Under Los Angeles (Part 2) | P&A Case Study

7:02

Intersecting Two Abandoned Wells Under Los Angeles (Part 1) | P&A Case Study

4:22

How to Plug & Abandon a Well With No Surface Access | Case Study

Let's talk

Have a well that has to be hit?

24/7 Emergency: +1 281 690 0322 Request a feasibility review →